I have a requirement to capture both machine and labour costs for a Production order using MES Job Registration. Machine costs should be based on the actual running hours whereas labour hours should be spread over the jobs being run simultaneously by the worker (i.e. in the Bundle). I can't find a way of doing this in standard AX 2012.So the scenario I have set up is a Route with a single Operation but with two lines Primary is for the Machine and a Secondary line for the human resource.
The MES created Job Journal for the primary operation (which is for a machine type resource) should be posted with the actual time. I.e. Hours = Finish time – Start time. It should not reduce the hours based on Bundling i.e. running multiple Jobs simultaneously. (Note in AX2009 there was a bundling option called “Normal” - Actual time for the job. This option has been removed in AX2012??).
Whereas the Secondary Jobs Journal line which is “Human Resource” type Resource would use the MES - Production parameter - Bundle Type of "Net time". This will allocate the cost of the person evenly across all of the Jobs they are working on at one time.
Any help would be much appreciated.
Mike